|

During 2000, the University completed a large number of
relatively small value projects. Many of these were necessary to ensure that
buildings complied with Health and Safety standards.
The Collaborative Training and Education Centre (ctec)
wing of the Anatomy Building, housing the Centre for Medical and Surgical Skills
which provides a training facility for medical and paramedical professionals,
was officially opened by Her Majesty Queen Elizabeth II and has been hailed as a
very successful initiative.
After a prolonged period of investigation, work recommenced
on the design of a new Chemistry/Biochemistry/Crystallography Building. The
commitment to this building is likely to reduce the University’s capacity to
undertake other expensive projects for the next three to four years.
| Projects
completed during 2000 |
COST
($ million) |
| Air
conditioning of Hackett Hall South |
0.27 |
| Refurbishment
of laboratory space in Biochemistry |
0.21 |
| New
glasshouse for Botany |
0.16 |
| Physics
Building new escape staircase |
0.10 |
| Physics
Building basement drainage |
0.25 |
| Fire
evacuation in Guild Building |
0.16 |
| Refurbishment
of old WA Water Authority Buildings at Shenton Park |
0.31 |
| New
laboratory in Engineering Building for Centre for Water Research |
0.31 |
| Ctec
extension to Anatomy Building* |
10.2 |
| PROJECTS THAT WERE INCOMPLETE AT 31 DECEMBER 2000 |
Estimated
Expenditure for 2000 ($ million) |
Total
Estimated Project Cost ($ million) |
| Oral
Health Centre for WA (OHCWA) |
3.5 |
35** |
| Riley
Centre |
1 |
20 |
| ‘Hot
Spots’ air-conditioning: Social Science Building and Human Movement
Building |
0.005 |
0.22 |
| Human
Movement extension |
|
2 |
| Fire
evacuation in Arts and Botany Buildings |
0.25 |
0.97 |
| New
Chemistry Building |
0.5 |
60.75 |
| Refurbishment
of F. J. Clarke Lecture Centre |
|
0.3 |
| Contribution
towards extension of Fremantle Hospital Animal House |
|
0.15 |
| Extension
and internal alterations to T Block, Fremantle Hospital |
0.012 |
1.5 |
| New
small animal facility on campus |
0.06 |
5.5 |
| New
small animal facility at QE II Medical Centre |
0.01 |
9*** |
| Refurbishment
of accommodation in Physics Building for the Australian
Telecommunications Collaborative Research Centre (ATCRC) |
0.3 |
0.4 |
| Refurbishment
of space in Physics Building for the Centre for Microscopy and
Microanalysis (CMM) |
1.35 |
1.5 |
| |
|
| * |
Funded from investment funds. |
| ** |
Includes State Government contribution. |
| *** |
Includes contribution of $3 million from
the National Health and Medical Research Council (NHMRC) via the WA
Institute of Medical Research (WAIMR). |
|